PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing metal decking at Derrick -3 (3rd Floor) Facing North (800x600).jpg Installing safety cables and poles at Derrick -3 (2nd Floor) Facing North (800x600).jpg Backfilling and compacting underground piping at Rahway Ave. Facing the new Building (800x600).jpg Installing rebar mats at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Installing Stair frames at Stair -5 Facing West (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing North-West (800x600).jpg Saw cut Rahway Ave. past the bridge Facing the new Building (800x600).jpg Underground piping Facing Administration building (800x600).jpg
Previous pageNext page Installing Stair frames at Stair -5 Facing West (800x600)
Installing Stair frames at Stair -5 Facing West (800x600)